Heat wave peak load check
Use when a utility load forecaster or grid operations planner needs to check a coming heat wave against recent demand and history. Reads the hourly forecast and heat alerts for the service area, recent and last-year temperatures, the balancing authority's daily demand from EIA and the climate normal, then flags peak risk days.
Open in Firecrawl Alexandria ↗Setup
Add Firecrawl to Claude. It takes a minute and gives Claude access to Firecrawl Alexandria.
firecrawl.dev/plugins ↗Ask
Paste this into Claude and swap the part in [brackets] for your own details.
Use the Firecrawl Alexandria "Heat wave peak load check" tool for this: [describe what you need]
It works on: For one balancing area and its main load centres.
Read
Claude pulls the data through Firecrawl Alexandria, a library of data from many different providers, instead of guessing.
Use it
You get the answer back with the data behind it. Check it, ask follow-ups, or run it again with different details.
What Claude follows from Firecrawl Alexandria
For one balancing area and its main load centres. Load centre coordinates are GeoJSON Points used in every weather call.
1. The coming heat
- Read National Weather Service · Forecast hourly for each load centre over the next 72 hours. Note daily highs, overnight lows and humidity.
- Read National Weather Service · Alerts active for each centre (events "Heat").
2. How unusual it is
- Read ACIS · Daily weather history for the last 30 days and the same 30 days last year at each centre.
- Read NASA POWER · Climate normals (T2M_MAX) for the month.
3. Demand history
- Find the daily balancing-authority demand route with EIA · Routes (path electricity/rto) and the respondent code with EIA · Facet values.
- Pull daily demand for the last 60 days and last summer's peak weeks with EIA · Data. Pair each past day's demand with its temperature from step 3.
Write the peak risk check
- Risk days: date, forecast high and low, alert status, closest past day by temperature and its demand.
- Overnight lows: warm nights that keep load high into the next day.
- Comparison: forecast versus normal and last year.
- Unknowns: EIA demand lags; say how many days it trails.
- Sources: cite every figure to the capability and record it came from. Say what could not be found rather than guessing.